Asbestos Surveys & Inspection Services
Management, Refurbishment and Demolition surveys to locate and assess asbestos-containing materials.

Service Overview
Greensurv delivers professional asbestos survey services across the United Kingdom in strict accordance with the Control of Asbestos Regulations 2012 (CAR 2012), HSG264 – Asbestos: The Survey Guide, and HSG227. Asbestos remains one of the most significant occupational health risks in the UK construction and property sectors. Under Regulation 4 of CAR 2012 (Duty to Manage), those responsible for non-domestic premises must identify the presence and condition of asbestos containing materials (ACMs), assess the risk, and implement a suitable management plan. Failure to comply may result in HSE enforcement notices, unlimited fines, or prosecution.
Management Asbestos Surveys
Management Surveys are required to locate ACMs that could be disturbed during normal occupation, routine maintenance, or foreseeable minor works. These surveys involve systematic inspection of accessible areas, sampling of suspect materials, and assessment of material condition. This survey supports compliance under Regulation 4 and forms the foundation of a legally compliant Asbestos Register.
Visual inspection of accessible fabric
Controlled intrusive inspection where required
Bulk sampling and UKAS laboratory analysis
Material Risk Assessment scoring using HSG227 algorithm
Integration with Fire, Water and Building compliance services
Clear recommendations for encapsulation, removal or management
Refurbishment & Demolition Surveys (R&D)
R&D surveys are legally required before any structural alteration, strip-out, service upgrade, or demolition works. These are fully intrusive surveys and are destructive by nature. They must be completed prior to contractor mobilisation to prevent uncontrolled fibre release.
Opening floor voids and sub-floor areas
Accessing service risers and ductwork
Removing ceiling tiles and opening voids
Breaking into partitions and boxing
Lifting floor finishes and inspecting adhesives
Key Benefits
Regulation-led Reporting
Aligned to HSG264 with annotated plans and photographic schedules.
CDM Compliant
Receive comprehensive reports with clear action plans and prioritized recommendations.
Regulation-led Reporting
Aligned to HSG264 with annotated plans and photographic schedules.
CDM Compliant
Receive comprehensive reports with clear action plans and prioritized recommendations.
Our Process
STEP 01
Desktop Study & Planning
We review existing building plans and consult with you to define the scope of the survey.
STEP 02
Site Survey
Our qualified surveyors conduct a systematic inspection, taking samples of suspected materials.
STEP 03
Laboratory Analysis
Samples are analyzed to confirm the presence and type of asbestos.
STEP 04
Detailed Reporting
You receive a comprehensive report with an asbestos register, risk assessments, and recommendations.
Frequently Asked Questions
Is an asbestos survey legally required?
Yes, for non-domestic premises under CAR 2012 Regulation 4.
How often should asbestos be re-inspected?
Typically every 12 months, or sooner if condition changes.
Can refurbishment works proceed without an R&D survey?
No. An R&D survey is mandatory before intrusive works begin.
Are domestic properties covered?
Owner-occupied homes are excluded, but landlords and managing agents do have duties.